回复:回复:自己装修地下室(附图)

来源: ccoasis 2005-01-31 16:25:19 [] [旧帖] [给我悄悄话] 本文已被阅读: 次 (668 bytes)
本文内容已被 [ ccoasis ] 在 2005-01-31 16:34:28 编辑过。如有问题,请报告版主或论坛管理删除.
回答: 自己装修地下室(附图)ccoasis2005-01-30 13:23:42
The framing is not "attached" to the wall directly, I use concrete nail to attach the bottom frame (PT wood) to the concrete floor, and use nails to attach the top frame to the roof joist - so it is not nailed to the concrete wall.

The ductwork in my basement took alot head spaces, but it just merely sit above the top frame of the door, so my ceiling panel is closely attached to the ductwork pipe. In certain places you may place a frame around the ductwork so that you can attach roofing panel to it.


Here is a very good guide for finishing basement, you may refer to the topics on framing ductwork.
http://www.howdididoit.com/Basement/

所有跟帖: 

thanks a lot -tolearn- 给 tolearn 发送悄悄话 (0 bytes) () 02/01/2005 postreply 04:48:27

请您先登陆,再发跟帖!

发现Adblock插件

如要继续浏览
请支持本站 请务必在本站关闭/移除任何Adblock

关闭Adblock后 请点击

请参考如何关闭Adblock/Adblock plus

安装Adblock plus用户请点击浏览器图标
选择“Disable on www.wenxuecity.com”

安装Adblock用户请点击图标
选择“don't run on pages on this domain”