first place, at least that's the way in my area. We also asked the buyer to have a preapproval letter from the bank when they make the offer. In the contract, buyer was required to apply for loan in a timely manner (about five days). I don't understand why this buyer takes so long to get rejected.
inspection should have been paid by the buyer in the
所有跟帖:
•
In our country basic termite and home inspection are paid by sel
-大红狐狸-
♂
(69 bytes)
()
12/14/2005 postreply
11:22:38
•
your country?
-gqc-
♀
(0 bytes)
()
12/14/2005 postreply
12:17:11
•
Opps, I mean county
-大红狐狸-
♂
(0 bytes)
()
12/14/2005 postreply
16:31:29