A lot of hard work
If you want to have a playset(with swings, etc.) you need at least a 20x30 area leveled and enclosed with pressure treated lumber, and then fill with at least 6in of sand. That's about 12 cubic yard and about 20 tons.
所有跟帖:
• 回复:A lot of hard work -lai--fu- ♀ (7 bytes) () 11/12/2007 postreply 15:45:53