get heat directly. He looked at the space under the (unfinished)attic floor.
2. Drill holes every 16 in around the house and rent a machine from HD. Pump in fire proofed shredded newspaper until filled the space between vertical beams, then move on to the next hole.
1. We were supposed to move the furnace into the attic so the se
所有跟帖:
•
i see. thanks. how much does it cost (material and labor )? of
-3apples-
♀
(0 bytes)
()
02/12/2015 postreply
14:17:40
•
if labor is 200-300 per day, it could be about $1250-1750.估计我人工算
-3apples-
♀
(118 bytes)
()
02/12/2015 postreply
14:24:24
•
Well, you save hundreds of heating bill every year.
-borisg-
♀
(0 bytes)
()
02/12/2015 postreply
14:26:27
•
是的,投资不大,但是很值得。
-3apples-
♀
(0 bytes)
()
02/12/2015 postreply
14:51:50