1. We were supposed to move the furnace into the attic so the se
get heat directly. He looked at the space under the (unfinished)attic floor.
2. Drill holes every 16 in around the house and rent a machine from HD. Pump in fire proofed shredded newspaper until filled the space between vertical beams, then move on to the next hole.