回复:必须选的是以后不好做的

回答: 必须选的是以后不好做的sneezy8882012-10-16 13:38:04

eg if there is a bedroom downstairs, and only a half bath downstairs, then you should pay them to make it a full bath even they charge you an arm and a leg. because if it is concrete slab foundation, it is almost impossible to do it later. but the upstair bathroom, talk to a contractor about price of a remodel.

long time ago a friend of mine asked the builder not to put in carpet and saved a couple thousand, which he used to put in much better flooring after close.

所有跟帖: 

非常感谢! -申巷九- 给 申巷九 发送悄悄话 申巷九 的博客首页 (137 bytes) () 10/16/2012 postreply 14:45:23

请您先登陆,再发跟帖!