How did the QA even sign off the production release if they don'

know a lot about the product at the first place? Who is the product owner? do they have product requirements? The QA should start with the product requirements document first.If they are doing the blackbox testing, what do they even care about the backend design?

所有跟帖: 

是这样:我这project 其实是把以前一个ACCESS写的project -expectingMM- 给 expectingMM 发送悄悄话 (436 bytes) () 12/07/2012 postreply 14:15:40

哈哈哈,就把你那个outdated document 扔给他看去。 -Eveline- 给 Eveline 发送悄悄话 Eveline 的博客首页 (151 bytes) () 12/07/2012 postreply 14:21:33

再给你说说他怎么当的manager吧.  -expectingMM- 给 expectingMM 发送悄悄话 (412 bytes) () 12/07/2012 postreply 14:35:43

真够受的。他的头是谁?他的头水平怎么样? -Eveline- 给 Eveline 发送悄悄话 Eveline 的博客首页 (185 bytes) () 12/07/2012 postreply 14:46:54

他的头就是我们的CEO呀. 我们公司还不到40人. -expectingMM- 给 expectingMM 发送悄悄话 (0 bytes) () 12/07/2012 postreply 14:54:04

难怪他去CEO那里告状 -Eveline- 给 Eveline 发送悄悄话 Eveline 的博客首页 (158 bytes) () 12/07/2012 postreply 15:08:19