120ppl isn't big factory in this industry,

if they're doing fashion with good flow, 1000wan should be enough. their cutting bed isn't for mass production puropse, and their warehouse looks too NEW, not too much material on stock. I guess their should be have very strong sales team. and i guess that is most cost from.

请您先登陆,再发跟帖!