最近做超级大项目顾问,他们要求我做个培训,下面是GROK给我写的提纲,太厉害了,我的妈!

来源: 2025-10-05 16:17:00 [博客] [旧帖] [给我悄悄话] 本文已被阅读:

最近在某国做超级大项目管理顾问,他们要求我做个培训,下面是GROK给我写的提纲,太厉害了,我的妈!

这么厉害,接下来叫TA放些图表生色,哈哈哈。

# EPCIC FPSO Project: Detailed Engineering Phase

## Slide 1: Title Slide
- **Title:** Detailed Engineering for EPCIC FPSO Project
- **Subtitle:** Transforming FEED into Construction-Ready Designs
- **Presenter:** [Your Name/Team]
- **Date:** October 05, 2025
- **Project Overview:** EPCIC contract for [FPSO Name/Location], focusing on topsides modules for offshore production, storage, and offloading.

## Slide 2: Agenda
- Project Overview and Objectives
- Scope of Detailed Engineering
- Key Phases and Schedule
- Disciplines and Interfaces
- Key Deliverables by Discipline
- Risk Management and Compliance
- Integration and Vendor Management
- Next Steps and Q&A

## Slide 3: Project Overview and Objectives
- **FPSO Context:** Floating Production Storage and Offloading unit for offshore oil/gas, integrating production, processing, storage, and offloading.
- **EPCIC Framework:** Engineering, Procurement, Construction, Installation, Commissioning – Detailed Engineering follows FEED to develop construction drawings and specifications.
- **Objectives:**
- Ensure design maturity for safe, efficient operations.
- Optimize multidisciplinary integration for topsides modules.
- Deliver IFC (Issued for Construction) packages compliant with codes/standards.
- **Key Metrics:** Target completion in [X months], with Level 4 schedule alignment.

## Slide 4: Scope of Detailed Engineering
- **Core Activities:**
- Develop detailed plans from FEED inputs, including vendor data incorporation.
- Prepare engineering drawings/documents for construction, assembly, pre-commissioning, start-up, and maintenance.
- Define and integrate interfaces with marine, mooring, and subsystems.
- Comply with Human Factors Engineering (HFE) and HSE standards.
- **Inputs:** FEED deliverables (PFDs, basic layouts), project philosophies, specifications.
- **Outputs:** Construction-ready designs minimizing field changes.
- **Exclusions:** Offshore installation (covered in C/I phases).

## Slide 5: Key Phases and Schedule
- **Phases Overview:**
1. **Kick-Off and Planning:** MDR development, Level 4 P6 schedule.
2. **Design Development:** Discipline-specific detailing and 3D modeling.
3. **Review and Integration:** HAZOP, vendor reviews, interface resolutions.
4. **IFC Release:** Final approvals and as-built preparations.
- **High-Level Schedule:** (Gantt-style outline)
- Month 1-2: Planning & Initial Designs
- Month 3-6: Core Detailing
- Month 7-9: Reviews & IFC
- **Milestones:** 100% Model Review at Month 5; IFC at Month 9.

## Slide 6: Disciplines Involved
- **Core Disciplines:**
- Process: Flow assurance, equipment sizing.
- Mechanical/Piping: Layouts, stress analysis.
- Electrical: Power distribution, lighting.
- Instrumentation/Control: Loop diagrams, safety systems.
- Civil/Structural: Module supports, foundations.
- **Supporting Disciplines:**
- Marine/Mooring: Turret interfaces, hull integration.
- HSE: Blast analysis, escape routes.
- Procurement: Material requisitions.
- **Collaboration:** Multidisciplinary reviews via 3D tools (e.g., PDMS/AVALON).

## Slide 7: Key Deliverables – Process & Mechanical
- **Process Engineering:**
- Updated PFDs and P&IDs.
- Heat & Material Balances (HMB).
- Equipment/Instrument Datasheets.
- PSV Studies.
- **Mechanical/Piping:**
- Piping GAs and Isometrics with BOM.
- 3D Model and Line Lists.
- Stress Analysis Reports.
- Equipment Layouts and MTOs.
- Pipe Support Details.

## Slide 8: Key Deliverables – Electrical, Instrumentation & Structural
- **Electrical Engineering:**
- Single-Line Diagrams (SLDs).
- Load Lists and Cable Schedules.
- Lighting/Earthing Layouts.
- Electrical Classification Plans.
- **Instrumentation/Control:**
- Instrument Index and Datasheets.
- Loop Diagrams (ILDs) and Hook-Ups.
- Control Narratives and ESD Programming.
- **Civil/Structural:**
- GA Drawings and Foundation Plans.
- Steel/Concrete Details and Calculations.
- Structural Analysis Reports.

## Slide 9: Risk Management and Compliance
- **Risks Addressed:**
- Interface clashes via 3D clash detection.
- Late vendor data impacting schedule (mitigate via early RFQs).
- HSE non-compliance (e.g., fluid system leaks in turrets).
- **Compliance:**
- Codes: API, ISO, DNV for FPSO specifics.
- Permits: Environmental (EPA), Safety (OSHA).
- Reviews: HAZOP, SIL assessments.
- **Metrics:** Zero major NCRs at IFC; 95% on-time deliverables.

## Slide 10: Integration and Vendor Management
- **Interfaces:** Topsides-hull, process-utility, third-party suppliers (e.g., compressors, turrets).
- **Vendor Process:**
- Material Requisitions (MRs) and Purchase Orders (POs).
- Vendor Data Review (VDR) for incorporation.
- Subcontractor coordination for fabrication yards.
- **Tools:** Integrated 3D modeling for real-time collaboration.

## Slide 11: Next Steps and Q&A
- **Immediate Actions:**
- Finalize MDR and kick-off meeting.
- Issue RFQs for long-lead items.
- Baseline Level 4 schedule.
- **Dependencies:** Client approvals on FEED changes.
- **Q&A:** Open floor for questions.
- **Thank You!** Contact: [Email/Phone]