来看看我说的对不对??

 

发展商成本:

1) Purchase of land;

2) Architect design fee;

3) Structural design fee;

4) Construction cost (including demolition, materials, construction (site engineers, skilled works and unskilled labors), landscaping, M&E (mechanical & Electrical), etc.

5) Other miscellaneous fees (legal fees, adminstration expenses, publicity, etc)

 

大概比例:

总投资费用(按花花新闻消息)= 约850元/每尺

1)土地:按花花新闻土地投标消息是 = 约430元/每尺 = 50% (占了一半)

4)constructoin cost,按老钟BCA的数据是 = 约200/每尺 = 25%

其他三项 (2)+ (3) +(5) = 900 - 430 - 200 = 270元/每尺 = 25%

 

Site manpower 工地人工费用(包括site engineers,skilled works and unskilled labors)在第四项 construction cost 可能约占30% ,占总投资费用约7~8%。

 

对不?

 

请您先登陆,再发跟帖!