The Ford class was conceived to address evolving threats and provide a high-end warfighting platform.
-
Northrop Grumman received a contract for the detail design and construction of the carrier, marking the completion of the initial design phase.
-
Additional contracts were awarded to Northrop Grumman to continue the engineering and design work for the USS Gerald R. Ford.
-
Major design changes were required to fix issues with the ship's main turbine generators, and these modifications were completed and verified by May 2017.
-
The USS Gerald R. Ford was formally delivered to the Navy and commissioned, a process that required installing the new components and resolving issues found during the initial design and construction phase
有关福特号为什么不能弹射F35C,大家不用再争论了。看看时间线。
所有跟帖:
•
福特已经服役八年了
-Bob007-
♂
(0 bytes)
()
09/28/2025 postreply
08:48:37
•
当初设计时F35还没定型
-Uusequery-
♀
(0 bytes)
()
09/28/2025 postreply
08:50:47
•
2001年F-35就已经拿到了合同,2006首飞
-cn_abcd-
♂
(0 bytes)
()
09/28/2025 postreply
08:52:43
•
福特号2005年开始建造
-Bob007-
♂
(0 bytes)
()
09/28/2025 postreply
08:57:23
•
这是F35C研发,装备时间线。。。
-Uusequery-
♀
(20088 bytes)
()
09/28/2025 postreply
09:01:39