回复:回复:有安装了太阳能的筒字请指点

回答: 回复:有安装了太阳能的筒字请指点ozstar2010-10-18 05:20:32

多谢各位。 刚刚上网察看, 原来要自己去申请。 请问申请的过程麻烦吗?

 

Conditions of Installation

 

 

 

1. Customers are required to obtain all relevant approvals, consents, and permits prior to installation –

please ensure that you check with your local council/planning authority and body corporate. Consent

and permit requirements do vary between states. For customers who do not own the property, you

must also ensure that you get written permission from the owner of the property and provide this to

Origin at the time of sale.

 

 

 

 

 

 

It is the customer’s responsibility to ensure the customer’s premises complies with relevant electricity

standards prior to solar installation. In the event the premise does not comply, customers will be

required to ensure all relevant works are completed by a qualified electrician. Works may include (but

not limited to) the following:

 

Rectifying an inadequate existing electrical supply.

 

Installation of a safety switch.

 

Upgrading of a switchboard.

 

Upgrading of meter panel board

 

Additional works where there is insufficient room in the meter box (for a Gross meter) for the

measuring of exported electricity or;

 

Where a meter box is non-compliant.