you need a permit with an estimated amount of cost

来源: borisg 2023-10-19 17:33:21 [] [博客] [旧帖] [给我悄悄话] 本文已被阅读: 次 (464 bytes)
回答: 火灾后的修理wait..2023-10-19 14:48:05

if there is no need to replace any framing lumber, you probably don't need an engineering drawing.

from what you said, i think you need these inspections:

fire block

insulation

electric

and finally the interior (doors, windows, walls, floors).

firefighter typically will break drywall and remove insulation to make sure there is no hidden burning materials.

 

 

所有跟帖: 

谢谢波大!我明白一些了 -wait..- 给 wait.. 发送悄悄话 wait.. 的博客首页 (0 bytes) () 10/19/2023 postreply 20:06:21

请您先登陆,再发跟帖!

发现Adblock插件

如要继续浏览
请支持本站 请务必在本站关闭/移除任何Adblock

关闭Adblock后 请点击

请参考如何关闭Adblock/Adblock plus

安装Adblock plus用户请点击浏览器图标
选择“Disable on www.wenxuecity.com”

安装Adblock用户请点击图标
选择“don't run on pages on this domain”