他们好像是用天然气发电的
IREN's Texas data centers, located in Childress and Sweetwater, are large-scale facilities designed for AI, high-performance computing, and bitcoin mining, powered by renewable energy. The Childress site is a 420-acre campus with a current capacity of 350MW (with plans for 750MW total) and features the "Horizon 1" AI data center. The Sweetwater location is a 2GW (2000MW) hub being developed across two sites, including Sweetwater 2, to support extensive AI/HPC workloads.
Childress Data Center
- Capacity: Currently 350MW, with expansion to 750MW planned.
- Location: 420-acre site in Childress County, Texas.
- Energy: Operates on 100% renewable energy.
- Grid Connection: Strategically connected to the ERCOT grid via a 345kV transmission line.
- AI Infrastructure: Includes "Horizon 1," a 75MW direct-to-chip liquid-cooled AI data center.
Sweetwater Data Center
- Capacity: Planned to be a 2GW (2000MW) data center hub.
- Location: Spanning 1,800 acres across two sites, Sweetwater 1 and Sweetwater 2.
- Energy: Primarily powered by renewable energy.
- AI Infrastructure: Designed to support a large number of high-density, AI-focused workloads, capable of housing over 700,000 liquid-cooled GPUs.
- Connectivity: Includes plans for a direct fiber loop linking Sweetwater 1 and 2.
Overall
- Purpose: Facilities support both bitcoin mining and high-density AI/HPC computing.
- Sustainability: A core focus is the use of renewable energy sources.
- Economic Impact: The projects are expected to create local jobs and contribute to the local economy.
- Growth: These developments are part of IREN's strategy to meet the growing demand for AI compute and secure a leading position in the sector