应该可以,具体要看city design codes.

来源: 2012-06-20 16:12:36 [旧帖] [给我悄悄话] 本文已被阅读:
能接public water就接。will need approval to run service line through neighboring lot. Not much room needed to install a 1" service line but many cities have minimum utility easement width requirement of 5'.