车库门改成窗户,Take the garage door off, build up a brick front, Brick-layer changes £250 a day, it is about a day's work, plus half day's preparation, it's £400 labour plus bricks, cement, £100. and install a window £350. All together £850.
Ceiling needs plaster boards and insulation, you need a plasterer to skim the walls and the ceiling, two days work £550, plus material £200. That's £750.
A electrician to do the wiring, a days work plus material £300 to £350, we take the higher one, £350.
铺地板,正常quality即可 wooden flooring £25 per squre meter (top quality),I think your garage is no more than 20square meters, plus underlay £100, this comes to £600, If you get people to do it,it's two days' work £500. All together £1100. (You could do it yourself though, a lot of people DIY wooden flooring.)
If you gets different trades men to it, it costs you well below £4000.
----报价6000--8000英镑,14--18天完成。他们负责申请等一切手续,有关电的都是带有certificate的那种。
2/ 房子原来建的是三个卧室,被现有主人改成四个卧室。我买完以后,要把卧室再改回到原来的三个卧室----报价500-1000英镑。只负责改结构,不负责墙面装修等等。
I think the wall between the two bedrooms you want to merge, is just plaster boards. It should NOT be a supporting wall for the ceiling. If you know it for sure, you could knock it down yourself. Take away the bedroom door, put in plaster board, skimming it. A plaster could do all this in a day. It should not cost you more than £400.
My lg's parents did the same thing as you, to get a building firm in to refurbish their bath room, same work as ours, We spent £5000, they spent £8000. It is true they did not have much hassle, but we did not have much trouble by buying the bathroom suit, the tiles, flooring , and the trades men we know to do it. Well worth the saving of £3000.